AD0-E307 Exam Questions Dumps, Selling Adobe Products [Q48-Q67]

Share

AD0-E307 Exam Questions Dumps, Selling Adobe Products

AD0-E307 Cert Guide PDF 100% Cover Real Exam Questions

NEW QUESTION 48
Which two tasks can be performed to reduce the probability of a delivery being blocked or flagged as 'spam' by anti-spam tools? (Choose two.)

  • A. Make sure your delivery does not contain only images
  • B. Specify an English translation for non English mails
  • C. Email content should have both HTML and text parts
  • D. Specify recipient's name in the greeting

Answer: B,D

 

NEW QUESTION 49
Which three tasks could a campaign business practitioner do to view a personalized version of a delivery?
(Choose three.)

  • A. Send the email to seed a list to compare
  • B. Utilize the test personalization option
  • C. Analyze the delivery after creating it
  • D. Send a proof of the delivery

Answer: B,C,D

 

NEW QUESTION 50
What are two ways to use seeds in a campaign? (Choose two.)

  • A. internal audience
  • B. content reviewer
  • C. reply-to address
  • D. proof target

Answer: B,D

 

NEW QUESTION 51
A campaign business practitioner is monitoring a delivery during its analysis. The campaign business practitioner notes that the audit has indicated two items with a warning. What happen with the delivery because of the warning?

  • A. The delivery generates an error and at the end of the analysis but deploys the email
  • B. The delivery deploys the email
  • C. The delivery generates an error and does NOT deploy
  • D. The delivery generates an error but does NOT deploy

Answer: B

 

NEW QUESTION 52
Workflow A runs before Workflow B. Workflow A populates a staging table that workflow B uses to load each day. Workflow B frequency fails because Workflow A is still creating the writing to the table. What is the best way for a campaign business practitioner to solve this error?

  • A. Use JavaScript to call a Signal in Workflows B instead of a time-based schedule
  • B. Remove the staging table because there is no need for temp storage
  • C. Adjust the scheduled run to ensure there is no overlap
  • D. Combine the two workflows together

Answer: C

 

NEW QUESTION 53
Sub-population A of 100 records and B of 200 records are combined in a campaign workflow with a Union activity. The resulting population C contains 200 records.
What should the Practitioner conclude?

  • A. Records in A have been excluded from C.
  • B. All of the records in B are also in A.
  • C. All of the records in A are also in B.
  • D. A and B are mutually exclusive.

Answer: C

 

NEW QUESTION 54
A campaign business practitioner needs to build an A/B test email campaign for two different promotions. By the theme that generates the most website visits, which email metric indicates the winning promotion theme?

  • A. Highest Click through rate
  • B. Highest open rate
  • C. Lowest activity rate
  • D. Lowest unsubscribe rate

Answer: A

 

NEW QUESTION 55
A workflow log indicates an incompatible document type error on a union activity. How should a campaign business practitioner verify the union activity inputs are based on?

  • A. The union activity's inputs are based on the same global dictionary
  • B. The union activity's inputs are based on the same filtering dimension
  • C. The union activity's inputs are based on the same targeting dimension
  • D. The union activity's inputs are based on the same target mapping

Answer: C

 

NEW QUESTION 56
What are two reasons to include the email address when importing a list of contacts? (Choose two.)

  • A. to meet legal requirements
  • B. to send a confirmation email
  • C. to update the primary key field
  • D. to populate the reconciliation key

Answer: B,C

 

NEW QUESTION 57
A workflow has a scheduler and default error management.
What happens if an error occurs during a run?

  • A. The scheduler starts another run at the next scheduled time and the run stops at the activity that had an error previously.
  • B. The scheduler does NOT start another run until the workflow is restarted.
  • C. The scheduler starts another run at the next scheduled time and runs normally.
  • D. The scheduler waits 24 hours before starting the next run based on the next scheduled time.

Answer: B

 

NEW QUESTION 58
What is the value for status and state of the edit options when a campaign reaches the schedule end date?

  • A. Completed but can still be edited
  • B. Finished and can no longer be edited
  • C. Finished but can still be edited
  • D. Completed and can no longer be edited

Answer: A

 

NEW QUESTION 59
A workflow including a scheduler with a recurring frequency contains a regular delivery step. What is the result?

  • A. The delivery is sent as scheduled for the first and second send
  • B. The delivery throws a warning message and executes as scheduled for first and second send.
  • C. The delivery executes once and errors on the second send.
  • D. The delivery executes once and enters a finished state.

Answer: A

 

NEW QUESTION 60
What is the purpose of configuring a campaign with start and end date?

  • A. To sequence campaign delivery
  • B. To ensure that the campaign works only between those dates
  • C. To ensure that dates show on campaign calendar
  • D. These dates are used for tracking purpose only

Answer: A

 

NEW QUESTION 61
The entire list of recipients for a campaign is unavailable at the start of an A/B test. The final list of the recipients will be placed in the finalRecipients folder but they will be loaded by the time the A/B test is complete. To start the A/B test, a list of exclusive recipients is used for the initial deliveries in the folder testRecipients.
How should the Business Practitioner modify the workflow diagram?

  • A. add the enrichment after the wait to add all recipients in the 'finalRecipients' folder to the complement from the split activity
  • B. modify the original query to all recipients in 'testRecipients' and modify the split activity to query the folder 'finalRecipients' in the complement
  • C. modify the original query to all recipients in 'testRecipients': change the A & B branches to 50% each, and add a new query after the wait to get all recipients in the 'finalRecipients' folder
  • D. modify the existing query to query all recipients in folders 'testRecipients' and 'finalRecipients'

Answer: B

 

NEW QUESTION 62
What is the required to create a predefined filter?

  • A. Rights on a folder of type filter
  • B. Validity period
  • C. Navigation hierarchy
  • D. Input form

Answer: A

 

NEW QUESTION 63
Which filtering dimension should a Practitioner use to identify responders in a cross-channel campaign?

  • A. tracking logs
  • B. delivery logs
  • C. approval logs
  • D. exclusion logs

Answer: A

 

NEW QUESTION 64
Campaign requirements state that a random selection of 20% of recipients be withheld from the targeting population to receive a different creative treatment in another campaign. How should the business practitioner configure the workflow?

  • A. Use a split activity to select the random sample and a list update activity to house the sample
  • B. Use the workflow properties to configure the random sample and it will be posted to the folder
  • C. Use a delivery activity to select the random sample and it will be posted the delivery logs
  • D. Use a query activity to select the random selection and a list update activity to house the sample

Answer: D

 

NEW QUESTION 65
What is the maximum number of Campaign application servers a single client can connect to at one time?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 66
A Practitioner is required to execute and store all deliveries related to a delivery template in specific folder defined by the business. How should the Practitioner most effectively implement this requirement?

  • A. Define Routing within the delivery properties of each delivery template.
  • B. Move all deliveries manually into defined folders.
  • C. Define specific Execution folders within the delivery properties of a delivery template.
  • D. Modify the delivery mapping to define the routing.

Answer: C

 

NEW QUESTION 67
......


Adobe AD0-E307 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Analyze and interpret deployment results
  • Identify workflow errors
Topic 2
  • Given a sample OOTB report data, provide an interpretation of the results
  • Interpret customer requirements
Topic 3
  • Given customer requirements, determine the appropriate report to generate
  • Design a new workflow based on business
  • campaign requirements
Topic 4
  • Apply the process to deploy a delivery and analyze results
  • Explain concepts related to Campaign Standard administration

 

Pass AD0-E307 Exam - Real Questions and Answers: https://freepdf.passtorrent.com/AD0-E307-latest-torrent.html